Abstract
In June 2026, a salvage excavation was conducted along a soling road (makadam), east of the Hazor Ha-Gelilit junction, at the Beʻer Magoz site (Bir el-Majawiz; Permit No. A-10309; map ref. 252600–69/765223–45; Fig. 1), in preparation for the construction of the railway line between Karmiel and Qiryat Shemona. The excavation was carried out on behalf of the Israel Antiquities Authority and funded by Netivei Israel. It was directed by S. Freireich (field photography) and U. Berger, with the assistance of Y. Yaakobi (administration), A. Peretz (munitions), A. Kleiner (photogrammetry), R. Kapul (metal detection), A. Shapiro (surveying and mapping), and laborers from the village of Shaʻab.
Excavator
Shmuel Freireich, Uri Berger
License Number
A-10309/2026
Excavation Date
2026
Recommended Citation
Freireich S, Berger U. , 2026. Beʻer Magoz (Bir el-Majawiz; The soling road) A-10309/2026 (A. Dayan ed.). In Favissa: Past Archaeological Excavation Reports. https://publications.iaa.org.il/favissa/353
Included in
Classical Archaeology and Art History Commons, Other History of Art, Architecture, and Archaeology Commons
